Worked example: a steel panel
Ask your AI tutorHave this lesson explained for your job
Your own assistant knows your role, your industry and your products. Pick a concept and it opens a ready-made prompt that asks for an explanation with examples from your world. The prompt tells the assistant not to invent emission factors or dates, and to finish with a question to check you understood.
- Scaling processes to a functional unitClaude (opens a new tab): explain Scaling processes to a functional unitChatGPT (opens a new tab): explain Scaling processes to a functional unit
- Turning an inventory into a GWP resultClaude (opens a new tab): explain Turning an inventory into a GWP resultChatGPT (opens a new tab): explain Turning an inventory into a GWP result
- HotspotsClaude (opens a new tab): explain HotspotsChatGPT (opens a new tab): explain Hotspots
- Sensitivity casesClaude (opens a new tab): explain Sensitivity casesChatGPT (opens a new tab): explain Sensitivity cases
“Copy prompt” works with any assistant, such as Gemini, Microsoft Copilot or your company’s own. Nothing is sent anywhere until you choose to.
This lesson runs every phase on one small product system. It’s the same panel you met in Why learn LCA?, costed both ways. In the Skills class you’ll get an AI assistant to reproduce this answer, and check that it did.
Goal and scope
Section titled “Goal and scope”- Goal: find the climate change hotspot in making a painted steel panel, to decide where the design team should look first. Internal use, no comparative assertion.
- Declared unit: 1 painted steel panel, at factory gate.
- Boundary: cradle-to-gate. Four processes: grid electricity, steel sheet production, paint production, panel assembly. Transport and packaging are excluded (a known limitation).
- Method: climate change, GWP₁₀₀, IPCC AR6.
The product system
Section titled “The product system” Electricity, grid ──► Steel sheet production ──► │ ╲ ├─────────────► Paint production ────────► Panel assembly ──► 1 panel │ ╱ └───────────────────────────────────────╯| Process | Makes | Needs | Direct emissions per unit made |
|---|---|---|---|
| Electricity, grid | 1 kWh | none | 0.35 kg CO₂, 0.0008 kg CH₄, 0.00001 kg N₂O |
| Steel sheet production | 1 kg steel | 0.6 kWh | 1.7 kg CO₂, 0.002 kg CH₄ |
| Paint production | 1 kg paint | 1.2 kWh | 2.1 kg CO₂, 0.0001 kg N₂O |
| Panel assembly | 1 panel | 4 kg steel, 0.25 kg paint, 3 kWh | none |
Inventory
Section titled “Inventory”-
Scale each process to one panel. Steel: 4 kg. Paint: 0.25 kg. Electricity is needed in three places:
assembly 3.0 kWhsteel 4 × 0.6 = 2.4 kWhpaint 0.25 × 1.2 = 0.3 kWhtotal 5.7 kWh -
Multiply each process’s emissions by its scale and sum.
Flow Electricity (×5.7) Steel (×4) Paint (×0.25) Total CO₂, fossil 1.995 6.8 0.525 9.32 kg CH₄, fossil 0.00456 0.008 0 0.01256 kg N₂O 0.000057 0 0.000025 0.000082 kg
Impact assessment
Section titled “Impact assessment”CO₂ 9.32 × 1 = 9.3200CH₄ 0.01256 × 29.8 = 0.3743N₂O 0.000082 × 273 = 0.0224 ────── 9.7167 kg CO₂-eq per panelInterpretation
Section titled “Interpretation”Contribution analysis:
| Process | kg CO₂-eq | Share |
|---|---|---|
| Steel sheet production | 7.04 | 72% |
| Electricity, grid | 2.15 | 22% |
| Paint production | 0.53 | 5% |
| Panel assembly (direct) | 0 | 0% |
Note that assembly causes 3 of the 5.7 kWh, so it’s responsible for about 1.1 kg CO₂-eq through its electricity use even though its direct emissions are zero. How you present contributions (by process, or by life cycle stage including upstream) changes the story. Say which one you’re showing.
Sensitivity: if the grid factor dropped from 0.35 to 0.05 kg CO₂/kWh (for example a renewable electricity contract), the total falls to about 8.01 kg CO₂-eq, a 17.6% cut. Steel remains the hotspot either way.
Conclusion: steel is the hotspot and should be the design team’s first target (less steel, or lower-carbon steel). Limitations: hypothetical data, transport and packaging excluded, climate change only.
Unit cost vs carbon cost
Scene 1 of 6
One painted steel panel
Start with the bill of materials.
InputQuantitySteel4 kgPaint0.25 kgElectricity (assembly)3 kWhThe same list you already use for costing.
The bill of materials for one painted steel panel: 4 kg of steel, 0.25 kg of paint and 3 kWh of electricity for assembly. It is the same list a costing team already uses.
Scene 2 of 6
Price every line
quantity × price = cost
InputQuantity€Steel4 kg€3.20Paint0.25 kg€2.00Electricity3 kWh€0.45Per panel€5.65Unit costing: multiply each quantity by its price. Steel costs €3.20, paint €2.00 and electricity €0.45, so one panel costs €5.65.
Scene 3 of 6
Give every line an emission factor
quantity × emission factor = carbon
Input€kg CO₂-eqSteel€3.207.942Paint€2.000.645Electricity€0.451.130Per panel€5.659.717Life cycle assessment uses the same list and the same maths, with an emission factor in place of the price. Steel gives 7.942 kg CO₂-eq, paint 0.645 and electricity 1.130, so one panel carries 9.717 kg CO₂-eq.
Scene 4 of 6
Already inside the number
The steel price already includes the mill’s energy bill.
The steel emission factor already includes the mill’s emissions.
A sketch of a steel mill sending 4 kg of steel to the panel. You do not add the mill’s energy bill to the price of steel, because the price already includes it. In the same way, the steel emission factor already includes the mill’s emissions. That is what cradle-to-gate means.
Scene 5 of 6
Same list, different hotspot
Steel is 57% of the panel’s cost but 82% of its carbon. Paint is 35% of the cost but only 7% of the carbon. The cost view and the carbon view point at different priorities.
Scene 6 of 6
Unit costing for the environment
Σ quantity × price = cost per unit
Σ quantity × emission factor = impact per unit
Same bill of materials. Same maths.
Check every number by hand in LCA 101, lesson 8.
Summary: the sum of quantity times price gives cost per unit; the sum of quantity times emission factor gives impact per unit. If you can cost a product, you can learn to assess it. Lesson 7 of LCA 101 works through these numbers by hand.
Exercise
Section titled “Exercise”Change the panel to use 3.5 kg of steel and 0.3 kg of paint. Recalculate the total and the steel share by hand, then open the answer below.
Answer
Electricity: 3 + 3.5×0.6 + 0.3×1.2 = 5.46 kWh. CO₂: 5.46×0.35 + 3.5×1.7 + 0.3×2.1 = 1.911 + 5.95 + 0.63 = 8.491 kg. CH₄: 5.46×0.0008 + 3.5×0.002 = 0.011368 kg. N₂O: 5.46×0.00001 + 0.3×0.0001 = 0.0000846 kg. Total: 8.491 + 0.33877 + 0.02310 = 8.853 kg CO₂-eq. Steel: 5.95 + 0.007×29.8 = 6.159, a 70% share.
What you should now be able to do
Section titled “What you should now be able to do”- Scale every process in a small product system to one functional unit.
- Turn an inventory into a climate change result with GWP factors.
- Run a contribution analysis and name the hotspot.
- Explain how a sensitivity case changes (or doesn’t change) the conclusion.
Free to learn on your own. Want a practitioner to teach you? Learn with a teacher